Shaft restoration Beringen

LocationBeringen

Shaft trestle restoration. This elevator shaft on the former mining site was being completely renovated. Replacing tons of steel, punching rivets, blasting and painting. Because of the enormous size, width and height, we had to “weave” the foil between the rack beams because the rack really couldn’t be built slimmer. A gigantic work of approximately 7000 m² of foil work.

Projects shown were made in specific conditions, that cannot reflect the conditions of your own project. Please contact us for more information and check out our range of Verisafe products.